PROJECT DATA
| PROJECT NAME | PROVIDEINTERCONNECTING B1LINE FROM BTF TO HMC PROJECT |
| OWNER | PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | GC MAINTENANCE ANDENGINEERING CO., LTD |
| YEAR OFCOMPLETION | YEAR 2023 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- CALIBRATION AND METER PROVERCERTIFY
BY EXCISE DEPARTMENT
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : BUTENE-1
| FLOW (TON/HR) | 6.5 |
| PRESSURE (Kg/Cm2) | 7.73 |
| TEMPERATURE (°C) | 26 |
| PIPE SIZE (INCH) | 3 |
| METER TYPE | CORIOLIS MASS FLOWMETER |