PROJECT DATA
| PROJECT NAME | METERING SKID FORINLAND CRUDE UNLOADINGFACILITIES INSTALLATION ATRAIL TRUCK LOADING TERMINAL |
| OWNER | PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | GC MAINTENANCE ANDENGINEERING CO., LTD |
| YEAR OFCOMPLETION | YEAR 2015 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSOIES METERINGSTATION
- FLOW COMPUTER AND CONTROL SYSTEM
- CALIBRATION AND METER PROVER CERTIFY BY EXCISE DEPARTMENT
- PLC PROGRAM DISPLAY
- ELECTRICAL HEAT TRAECING
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : CRUDE OIL
| FLOW (TON/HR) | 100 |
| PRESSURE (Kg/Cm2) | 11.1 |
| TEMPERATURE (°C) | 50 |
| PIPE SIZE (INCH) | 4 |
| METER TYPE | POSITIVE DISPLACEMENT,BIROTOR TYPE |