PROJECT DATA
| LOCATION | PROCESS STEAM PIPING AND22KV TRANSMISSION LINE SYSTEM OF BANPON GUTILITIES SPP PROJECT |
| OWNER | EGCO GROUP(SITE BPU) |
| MAINCONTRACTOR | ITALTHAI ENGINEERING |
| YEAR OFCOMPLETION | YEAR 2018 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| CONSTRUCTION SUPERVISION &COMMISSIONING | STARTUP |
CONDITION DATA : MEDIUM PRESSURE STEAM
| FLOW (TON/HR) | 100 |
| PRESSURE (Kg/Cm2) | 10(+/-1) |
| TEMPERATURE (°C) | SATURATED |
| PIPE SIZE (INCH) | 12 |
| DISTRIBUTION LENGTH (M) |