{"id":5523,"date":"2026-04-22T22:06:54","date_gmt":"2026-04-22T22:06:54","guid":{"rendered":"https:\/\/www.demo-marketmakers.com\/?p=5523"},"modified":"2026-04-22T22:06:57","modified_gmt":"2026-04-22T22:06:57","slug":"abct-amii-steam-transmission-pipeline-and-metering-station","status":"publish","type":"post","link":"https:\/\/www.demo-marketmakers.com\/index.php\/2026\/04\/22\/abct-amii-steam-transmission-pipeline-and-metering-station\/","title":{"rendered":"(ABCT-AM(II) STEAM TRANSMISSION PIPELINE AND METERING STATION\u200b"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>PROJECT&nbsp;DATA<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>LOCATION\u200b<\/td><td>(ABCT-AM(II) STEAM TRANSMISSION PIPELINE AND METERING STATION\u200b<\/td><\/tr><tr><td>OWNER<\/td><td>GLOW ENERGY PUBLIC COMPANY LIMITED (GLOW)<\/td><\/tr><tr><td>MAINCONTRACTOR\u200b<\/td><td>ACE ENGINEERING\u200b AND CONSTRUCTION CO.,LTD<\/td><\/tr><tr><td>YEAR OFCOMPLETION\u200b<\/td><td>YEAR 2025<\/td><\/tr><tr><td>CONTRACTVALUE\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PROJECT DESCRIPTION\u200b<\/strong><\/h3>\n\n\n\n<p>PIPELINE DISTRIBUTION AND OTHER WORK\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ENGINEERING AND DOCUMENT WORK\u200b<\/li>\n\n\n\n<li>FLOW METER AND ACCESSORIES&nbsp;METERING STATION\u200b<\/li>\n\n\n\n<li>FLOW COMPUTER AND CONTROL&nbsp;SYSTEM\u200b<\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TECHTRONIC SCOPE OF WORK&nbsp;<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>BASIC DESIGN\u200b<\/td><td>DETAIL ENGINEERING<\/td><\/tr><tr><td>CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b<\/td><td>STARTUP\u200b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;<\/strong>\u200b<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>60<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>10(+\/-2)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>195(+\/-10)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>14<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)&nbsp;\u200b<\/td><td>1300<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>CONDITION DATA : CONDENSATE RETURN <\/strong>\u200b<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>60<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>60(+\/=1)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>85(+\/-)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>6<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)&nbsp;\u200b<\/td><td>1300<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT&nbsp;DATA LOCATION\u200b (ABCT-AM(II) STEAM TRANSMISSION PIPELINE AND METERING STATION\u200b OWNER GLOW ENERGY PUBLIC COMPANY LIMITED (GLOW) MAINCONTRACTOR\u200b ACE ENGINEERING\u200b AND CONSTRUCTION CO.,LTD YEAR OFCOMPLETION\u200b YEAR 2025 CONTRACTVALUE\u200b PROJECT DESCRIPTION\u200b PIPELINE DISTRIBUTION AND OTHER WORK\u200b TECHTRONIC SCOPE OF WORK&nbsp; BASIC DESIGN\u200b DETAIL ENGINEERING CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b STARTUP\u200b CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;\u200b FLOW (TON\/HR) 60 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5551,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[110,111],"tags":[],"class_list":["post-5523","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application","category-stream-metering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5523","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/comments?post=5523"}],"version-history":[{"count":1,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5523\/revisions"}],"predecessor-version":[{"id":5554,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5523\/revisions\/5554"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media\/5551"}],"wp:attachment":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media?parent=5523"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/categories?post=5523"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/tags?post=5523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}