{"id":5519,"date":"2026-04-22T21:57:24","date_gmt":"2026-04-22T21:57:24","guid":{"rendered":"https:\/\/www.demo-marketmakers.com\/?p=5519"},"modified":"2026-04-22T21:57:28","modified_gmt":"2026-04-22T21:57:28","slug":"process-steam-piping-and22kv-transmission-line-system-of-banpon-gutilities-spp-project","status":"publish","type":"post","link":"https:\/\/www.demo-marketmakers.com\/index.php\/2026\/04\/22\/process-steam-piping-and22kv-transmission-line-system-of-banpon-gutilities-spp-project\/","title":{"rendered":"PROCESS STEAM PIPING AND22KV TRANSMISSION LINE SYSTEM OF BANPON GUTILITIES SPP PROJECT\u200b"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>PROJECT&nbsp;DATA<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>LOCATION\u200b<\/td><td>PROCESS STEAM PIPING AND22KV TRANSMISSION LINE SYSTEM OF BANPON GUTILITIES SPP PROJECT\u200b<\/td><\/tr><tr><td>OWNER<\/td><td>EGCO GROUP(SITE BPU)\u200b<\/td><\/tr><tr><td>MAINCONTRACTOR\u200b<\/td><td>ITALTHAI ENGINEERING\u200b<\/td><\/tr><tr><td>YEAR OFCOMPLETION\u200b<\/td><td>YEAR 2018<\/td><\/tr><tr><td>CONTRACTVALUE\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PROJECT DESCRIPTION\u200b<\/strong><\/h3>\n\n\n\n<p>PIPELINE DISTRIBUTION AND OTHER WORK\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ENGINEERING AND DOCUMENT WORK\u200b<\/li>\n\n\n\n<li>FLOW METER AND ACCESSORIES&nbsp;METERING STATION\u200b<\/li>\n\n\n\n<li>FLOW COMPUTER AND CONTROL&nbsp;SYSTEM\u200b<\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TECHTRONIC SCOPE OF WORK&nbsp;<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>BASIC DESIGN\u200b<\/td><td>DETAIL ENGINEERING<\/td><\/tr><tr><td>CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b<\/td><td>STARTUP\u200b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;<\/strong>\u200b<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>100<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>10(+\/-1)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>SATURATED<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>12<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)&nbsp;\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT&nbsp;DATA LOCATION\u200b PROCESS STEAM PIPING AND22KV TRANSMISSION LINE SYSTEM OF BANPON GUTILITIES SPP PROJECT\u200b OWNER EGCO GROUP(SITE BPU)\u200b MAINCONTRACTOR\u200b ITALTHAI ENGINEERING\u200b YEAR OFCOMPLETION\u200b YEAR 2018 CONTRACTVALUE\u200b PROJECT DESCRIPTION\u200b PIPELINE DISTRIBUTION AND OTHER WORK\u200b TECHTRONIC SCOPE OF WORK&nbsp; BASIC DESIGN\u200b DETAIL ENGINEERING CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b STARTUP\u200b CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;\u200b FLOW (TON\/HR) 100 PRESSURE [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5536,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[110,111],"tags":[],"class_list":["post-5519","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application","category-stream-metering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5519","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/comments?post=5519"}],"version-history":[{"count":1,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5519\/revisions"}],"predecessor-version":[{"id":5538,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5519\/revisions\/5538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media\/5536"}],"wp:attachment":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media?parent=5519"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/categories?post=5519"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/tags?post=5519"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}