{"id":5487,"date":"2026-04-22T21:39:09","date_gmt":"2026-04-22T21:39:09","guid":{"rendered":"https:\/\/www.demo-marketmakers.com\/?p=5487"},"modified":"2026-04-22T21:39:12","modified_gmt":"2026-04-22T21:39:12","slug":"nneg-steam-pipeline-and-115kv-22-kv-transmission-lines-project-site-bvp","status":"publish","type":"post","link":"https:\/\/www.demo-marketmakers.com\/index.php\/2026\/04\/22\/nneg-steam-pipeline-and-115kv-22-kv-transmission-lines-project-site-bvp\/","title":{"rendered":"NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site BVP)\u200b"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>PROJECT&nbsp;DATA<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>LOCATION\u200b<\/td><td>NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site BVP)\u200b<\/td><\/tr><tr><td>OWNER<\/td><td>NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG)<\/td><\/tr><tr><td>MAINCONTRACTOR\u200b<\/td><td>THAI SHINRYO LIMITED<\/td><\/tr><tr><td>YEAR OFCOMPLETION\u200b<\/td><td>YEAR 2016<\/td><\/tr><tr><td>CONTRACTVALUE\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PROJECT DESCRIPTION\u200b<\/strong><\/h3>\n\n\n\n<p>PIPELINE DISTRIBUTION AND OTHER WORK\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ENGINEERING AND DOCUMENT WORK\u200b<\/li>\n\n\n\n<li>FLOW METER AND ACCESSORIES&nbsp;METERING STATION\u200b<\/li>\n\n\n\n<li>FLOW COMPUTER AND CONTROL&nbsp;SYSTEM\u200b<\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TECHTRONIC SCOPE OF WORK&nbsp;<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>BASIC DESIGN\u200b<\/td><td>DETAIL ENGINEERING<\/td><\/tr><tr><td>CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b<\/td><td>STARTUP\u200b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;<\/strong>\u200b<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>6.0<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>9.5(+\/-1)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>212(+\/-5)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>6<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)&nbsp;\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT&nbsp;DATA LOCATION\u200b NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site BVP)\u200b OWNER NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG) MAINCONTRACTOR\u200b THAI SHINRYO LIMITED YEAR OFCOMPLETION\u200b YEAR 2016 CONTRACTVALUE\u200b PROJECT DESCRIPTION\u200b PIPELINE DISTRIBUTION AND OTHER WORK\u200b TECHTRONIC SCOPE OF WORK&nbsp; BASIC DESIGN\u200b DETAIL ENGINEERING CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b STARTUP\u200b CONDITION DATA : MEDIUM [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[110,111],"tags":[],"class_list":["post-5487","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application","category-stream-metering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5487","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/comments?post=5487"}],"version-history":[{"count":1,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5487\/revisions"}],"predecessor-version":[{"id":5502,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5487\/revisions\/5502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media\/5499"}],"wp:attachment":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media?parent=5487"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/categories?post=5487"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/tags?post=5487"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}