{"id":5485,"date":"2026-04-22T21:35:37","date_gmt":"2026-04-22T21:35:37","guid":{"rendered":"https:\/\/www.demo-marketmakers.com\/?p=5485"},"modified":"2026-04-22T21:35:40","modified_gmt":"2026-04-22T21:35:40","slug":"nneg-steam-pipeline-and-115kv-22-kv-transmission-lines-project-site-tostem-2-north","status":"publish","type":"post","link":"https:\/\/www.demo-marketmakers.com\/index.php\/2026\/04\/22\/nneg-steam-pipeline-and-115kv-22-kv-transmission-lines-project-site-tostem-2-north\/","title":{"rendered":"NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site TOSTEM-2 (NORTH)\u200b"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>PROJECT&nbsp;DATA<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>LOCATION\u200b<\/td><td>NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site TOSTEM-2 (NORTH)\u200b<\/td><\/tr><tr><td>OWNER<\/td><td>NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG)<\/td><\/tr><tr><td>MAINCONTRACTOR\u200b<\/td><td>THAI SHINRYO LIMITED<\/td><\/tr><tr><td>YEAR OFCOMPLETION\u200b<\/td><td>YEAR 2015<\/td><\/tr><tr><td>CONTRACTVALUE\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PROJECT DESCRIPTION\u200b<\/strong><\/h3>\n\n\n\n<p>PIPELINE DISTRIBUTION AND OTHER WORK\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ENGINEERING AND DOCUMENT WORK\u200b<\/li>\n\n\n\n<li>FLOW METER AND ACCESSORIES&nbsp;METERING STATION\u200b<\/li>\n\n\n\n<li>FLOW COMPUTER AND CONTROL&nbsp;SYSTEM\u200b<\/li>\n<\/ul>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TECHTRONIC SCOPE OF WORK&nbsp;<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>BASIC DESIGN\u200b<\/td><td>DETAIL ENGINEERING<\/td><\/tr><tr><td>CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b<\/td><td>STARTUP\u200b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;<\/strong>\u200b<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>8.4<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>6(+\/-1)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>165(+\/-5)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>6<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)&nbsp;\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT&nbsp;DATA LOCATION\u200b NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT (Site TOSTEM-2 (NORTH)\u200b OWNER NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG) MAINCONTRACTOR\u200b THAI SHINRYO LIMITED YEAR OFCOMPLETION\u200b YEAR 2015 CONTRACTVALUE\u200b PROJECT DESCRIPTION\u200b PIPELINE DISTRIBUTION AND OTHER WORK\u200b TECHTRONIC SCOPE OF WORK&nbsp; BASIC DESIGN\u200b DETAIL ENGINEERING CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b STARTUP\u200b CONDITION DATA : [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5491,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[110,111],"tags":[],"class_list":["post-5485","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-application","category-stream-metering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/comments?post=5485"}],"version-history":[{"count":1,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5485\/revisions"}],"predecessor-version":[{"id":5493,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/5485\/revisions\/5493"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media\/5491"}],"wp:attachment":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media?parent=5485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/categories?post=5485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/tags?post=5485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}