{"id":3439,"date":"2026-03-01T15:45:22","date_gmt":"2026-03-01T15:45:22","guid":{"rendered":"https:\/\/www.demo-marketmakers.com\/?p=3439"},"modified":"2026-04-22T21:15:43","modified_gmt":"2026-04-22T21:15:43","slug":"project-application-and-references-stream-metering","status":"publish","type":"post","link":"https:\/\/www.demo-marketmakers.com\/index.php\/2026\/03\/01\/project-application-and-references-stream-metering\/","title":{"rendered":"NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT(Site GHP)\u200b"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><strong>PROJECT&nbsp;DATA<\/strong><\/h3>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>LOCATION\u200b<\/td><td>NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT(Site GHP)\u200b<\/td><\/tr><tr><td>OWNER<\/td><td>NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG)<\/td><\/tr><tr><td>MAINCONTRACTOR\u200b<\/td><td>THAI SHINRYO LIMITED<\/td><\/tr><tr><td>YEAR OFCOMPLETION\u200b<\/td><td>YEAR 2015\u200b<\/td><\/tr><tr><td>CONTRACTVALUE\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PROJECT DESCRIPTION\u200b<\/strong><\/h3>\n\n\n\n<p>PIPELINE DISTRIBUTION AND OTHER WORK\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ELECTRICAL &amp; INSTRUMENT WORK\u200b<\/li>\n\n\n\n<li>FLOW METER AND ACCESSORIES METERING STATION\u200b<\/li>\n\n\n\n<li>FLOW COMPUTER AND CONTROL SYSTEM<\/li>\n<\/ul>\n\n\n\n<p>BY EXCISE DEPARTMENT<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TECHTRONIC SCOPE OF WORK&nbsp;<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>BASIC DESIGN\u200b<\/td><td>DETAIL ENGINEERING<\/td><\/tr><tr><td>CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b<\/td><td>STARTUP\u200b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading\"><strong><strong>CONDITION DATA : MEDIUM PRESSURE STEAM&nbsp;<\/strong><\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>10\u200b<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>8(+\/-1)\u200b<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>175(+\/-5)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>6\u200b<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)\u00a0\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><strong><strong><strong>CONDITION DATA : CONDENSATE RETURN :<\/strong>\u200b<\/strong><\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>FLOW (TON\/HR)<\/td><td>14\u200b<\/td><\/tr><tr><td>PRESSURE (Kg\/Cm2)<\/td><td>4(+\/=1)<\/td><\/tr><tr><td>TEMPERATURE (\u00b0C)<\/td><td>90(+\/-)<\/td><\/tr><tr><td>PIPE SIZE (INCH)<\/td><td>4<\/td><\/tr><tr><td>DISTRIBUTION LENGTH (M)\u00a0\u200b<\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT&nbsp;DATA LOCATION\u200b NNEG STEAM PIPELINE AND 115KV &amp; 22 KV TRANSMISSION LINES PROJECT(Site GHP)\u200b OWNER NAVA NAKORN ELECTRICITY GENERATING CO., LTD. (NNEG) MAINCONTRACTOR\u200b THAI SHINRYO LIMITED YEAR OFCOMPLETION\u200b YEAR 2015\u200b CONTRACTVALUE\u200b PROJECT DESCRIPTION\u200b PIPELINE DISTRIBUTION AND OTHER WORK\u200b BY EXCISE DEPARTMENT TECHTRONIC SCOPE OF WORK&nbsp; BASIC DESIGN\u200b DETAIL ENGINEERING CONSTRUCTION SUPERVISION &amp;COMMISSIONING\u200b STARTUP\u200b CONDITION DATA [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3317,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[111],"tags":[],"class_list":["post-3439","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stream-metering"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/3439","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/comments?post=3439"}],"version-history":[{"count":5,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/3439\/revisions"}],"predecessor-version":[{"id":5483,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/posts\/3439\/revisions\/5483"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media\/3317"}],"wp:attachment":[{"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/media?parent=3439"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/categories?post=3439"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.demo-marketmakers.com\/index.php\/wp-json\/wp\/v2\/tags?post=3439"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}