PROJECT DATA
| PROJECT NAME | TPG METERING STATION OLEFINS RECONFIGURATION PROJECT |
| OWNER | GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | TTCL PUBLIC COMPANYLIMITED. |
| YEAR OFCOMPLETION | YEAR 2018 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- MANUAL VALVE AND ACCESSORIES
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : TPG
| FLOW (TON/HR) | 50/100 |
| PRESSURE (Kg/Cm2) | 18.50/13.55 |
| TEMPERATURE (°C) | 32.6 |
| PIPE SIZE (INCH) | 6 |



