PROJECT APPLICATION AND REFFERENCES

PTTEP GREATER S1 ASSETS​

PROJECT DATA

PROJECT NAME​PTTEP GREATER S1 ASSETS​
OWNERPTTEP SIAM LIMITTED​
MAINCONTRACTOR​PTTEP SIAM LIMITTED​
YEAR OFCOMPLETION​YEAR 2013
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSORIES METERING STATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​
  • CALIBRATION AND METER PROVER CERTIFY​ BY EXCISE DEPARTMENT

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
PROJECT MANAGEMENT​PROCUREMENT​
FABRICATION AND INSTALLATION​COMMISSIONING AND STARTUP​

CONDITION DATA : : CUSTODY CRUDE METERING SKID

FLOW (TON/HR)20000-80000
PRESSURE (Kg/Cm2)72.5-87
TEMPERATURE (°C)50-60
PIPE SIZE (INCH)8
METER TYPEPOSITIVE DISPLACEMENT,BIROTOR TYPE​

Related Posts

About Us

Product

Service

Project

News

Techtronic Co., Ltd | We're Flow Specialist
Think Improvement Think Techtronic