PROJECT DATA
| PROJECT NAME | PROPANE/LPG FEED PIPELINE MODIFICATION FOR OMP PROJECT |
| OWNER | GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | TECHTRONIC CO., LTD |
| YEAR OFCOMPLETION | YEAR 2021 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- MANUAL VALVE AND ACCESSORIES
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : MIX-C4
| FLOW (TON/HR) | 42/122 |
| PRESSURE (Kg/Cm2) | 42/122 |
| TEMPERATURE (°C) | -10/70 |
| PIPE SIZE (INCH) | 8 |
| METER TYPE | CORIOLIS MASSFLOW METER |