PROJECT DATA
| PROJECT NAME | DEMINERALIZED WATER SUPPLY SYSTEM AND METERING STATION FOR ACTH |
| OWNER | GLOBAL POWER SYNERGYPUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | ACE ENGINEERING AND CONSTRUCTION CO., LTD |
| YEAR OFCOMPLETION | YEAR 2022 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- MANUAL VALVE AND ACCESORIES
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : : CUSTODY CRUDE METERING SKID
| FLOW (TON/HR) | 2/6 |
| PRESSURE (Kg/Cm2) | 6 |
| TEMPERATURE (°C) | AMBIEN |
| PIPE SIZE (INCH) | 12 |
| METER TYPE | DEMINERALIZED WATER |