PROJECT APPLICATION AND REFFERENCES

METERING SKID FOR INLAND CRUDE UNLOADING FACILITIES INSTALLATION AT RAIL CAR LOADING TERMINAL (QUICK-WIN PHASE) MAPTAPUT​

UNLOADING

PROJECT DATA

LOCATION​METERING SKID FOR INLAND CRUDE UNLOADING FACILITIES INSTALLATION AT RAIL CAR LOADING TERMINAL (QUICK-WIN PHASE) MAPTAPUT
OWNERPTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED​
MAINCONTRACTOR​TECHTRONIC COMPANY LIMITED​
YEAR OFCOMPLETION​YEAR 2014​
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSOIES METERING STATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​
  • MANUAL VALVE AND ACCESSORIES

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
PROJECT MANAGEMENT​PROCUREMENT​
FABRICATION AND INSTALLATION​COMMISSIONING ,TANK PROVER AND STARTUP

CONDITION DATA : BIODIESEL 

FLOW (m³/HR)60-200​
PRESSURE (Kg/Cm2)12.82-13.50​
TEMPERATURE (°C)40-50
PIPE SIZE (INCH)6​
METER TYPE2.8×12.85X2.707 (2nd Floor)