PROJECT DATA
| LOCATION | LOADING FACILITY FOR INLAND CRUDE TRANSPORTATION BY ROAD |
| OWNER | PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED |
| MAINCONTRACTOR | TECHTRONIC COMPANY LIMITED |
| YEAR OFCOMPLETION | YEAR 2014 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSOIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- CALIBRATION AND METER PROVER CERTIFY BY EXCISE DEPARTMENT
- PLC PROGRAM DISPLAY
- ELECTRICAL HEAT TRAECING
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING ,TANK PROVER AND STARTUP |
CONDITION DATA : BIODIESEL
| FLOW (m³/HR) | 100 |
| PRESSURE (Kg/Cm2) | 11.1 |
| TEMPERATURE (°C) | 50 |
| PIPE SIZE (INCH) | 4 |
| METER TYPE | POSITIVE DISPLACEMENT, BIROTOR TYPE |
| DISTRIBUTION LENGTH | 4.6X12.88X2.711 |

