PROJECT APPLICATION AND REFFERENCES

MIX-C4 METERINGPACKAGE (M4) (OLEFINSRECONFIGURATIONPROJECT)​

PROJECT DATA

LOCATION​MIX-C4 METERINGPACKAGE (M4) (OLEFINSRECONFIGURATIONPROJECT)​
OWNERPTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED​
MAINCONTRACTOR​PTT GLOBAL CHEMICAL PUBLIC COMPANY LIMITED​
YEAR OFCOMPLETION​YEAR 2020
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSOIES METERINGSTATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​
  • CALIBRATION AND METER PROVERCERTIFY​

BY EXCISE DEPARTMENT

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
PROJECT MANAGEMENT​PROCUREMENT​
FABRICATION AND INSTALLATION​COMMISSIONING AND STARTUP​

CONDITION DATA : BIODIESEL 

FLOW (TON/HR)20/35
PRESSURE (Kg/Cm2)15.5/29.5
TEMPERATURE (°C)44/65
PIPE SIZE (INCH)4
METER TYPECORIOLIS MASS FLOWMETER