PROJECT DATA
| LOCATION | NEW PROPYLENEPIPELINE TO HMC PP#4PROJECT |
| OWNER | PTT GLOBAL CHEMICALPUBLIC COMPANYLIMITED |
| MAINCONTRACTOR | GC MAINTENANCE ANDENGINEERING CO., LTD |
| YEAR OFCOMPLETION | YEAR 2021 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSOIES METERINGSTATION
- FLOW COMPUTER AND CONTROL SYSTEM
- CALIBRATION AND METER PROVERCERTIFY
BY EXCISE DEPARTMENT
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : BIODIESEL
| FLOW (TON/HR) | 38.05/57.05 |
| PRESSURE (Kg/Cm2) | 21.46/27.99 |
| TEMPERATURE (°C) | 43/65 |
| PIPE SIZE (INCH) | 3 |
| METER TYPE | CORIOLIS MASS FLOWMETER |



