PROJECT APPLICATION AND REFFERENCES

(ABCT-AM(II) STEAM TRANSMISSION PIPELINE AND METERING STATION​

PROJECT DATA

LOCATION​(ABCT-AM(II) STEAM TRANSMISSION PIPELINE AND METERING STATION​
OWNERGLOW ENERGY PUBLIC COMPANY LIMITED (GLOW)
MAINCONTRACTOR​ACE ENGINEERING​ AND CONSTRUCTION CO.,LTD
YEAR OFCOMPLETION​YEAR 2025
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSORIES METERING STATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
CONSTRUCTION SUPERVISION &COMMISSIONING​STARTUP​

CONDITION DATA : MEDIUM PRESSURE STEAM 

FLOW (TON/HR)60
PRESSURE (Kg/Cm2)10(+/-2)
TEMPERATURE (°C)195(+/-10)
PIPE SIZE (INCH)14
DISTRIBUTION LENGTH (M) ​1300

CONDITION DATA : CONDENSATE RETURN

FLOW (TON/HR)60
PRESSURE (Kg/Cm2)60(+/=1)
TEMPERATURE (°C)85(+/-)
PIPE SIZE (INCH)6
DISTRIBUTION LENGTH (M) ​1300