PROJECT APPLICATION AND REFFERENCES

PROPANE/LPG FEED PIPELINE MODIFICATION FOR OMP PROJECT​

PROJECT DATA

PROJECT NAME​PROPANE/LPG FEED PIPELINE MODIFICATION FOR OMP PROJECT​
OWNERGLOBAL CHEMICAL PUBLIC COMPANY LIMITED​
MAINCONTRACTOR​TECHTRONIC CO., LTD​
YEAR OFCOMPLETION​YEAR 2021
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSORIES METERING STATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​
  • MANUAL VALVE AND ACCESSORIES

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
PROJECT MANAGEMENT​PROCUREMENT​
FABRICATION AND INSTALLATION​COMMISSIONING AND STARTUP​

CONDITION DATA : MIX-C4

FLOW (TON/HR)42/122
PRESSURE (Kg/Cm2)42/122
TEMPERATURE (°C)-10/70
PIPE SIZE (INCH)8
METER TYPECORIOLIS MASSFLOW METER​