PROJECT DATA
| PROJECT NAME | CUMENE METERING STATION OLEFINS RECONFIGURATION PROJECT |
| OWNER | GC PHENOL CO.,LTD |
| MAINCONTRACTOR | TECHTRONIC CO.,LTD |
| YEAR OFCOMPLETION | YEAR 2019 |
| CONTRACTVALUE |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- MANUAL VALVE AND ACCESSORIES
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : CUMENE
| FLOW (TON/HR) | 4.5/6 |
| PRESSURE (Kg/Cm2) | 6.17/16.00 |
| TEMPERATURE (°C) | 38/65 |
| PIPE SIZE (INCH) | 6 |
| METER TYPE | CORIOLIS MASSFLOW METER |