PROJECT DATA
| PROJECT NAME | NFCT FUEL TANK FARM PROJECT |
| OWNER | NFCT COMPANY LIMITED |
| MAINCONTRACTOR | CHINA PETROLEUM PIPELINEENGINEERING CO., LTD |
| YEAR OFCOMPLETION | YEAR 2020 |
| CONTRACTVALUE | |
PROJECT DESCRIPTION
PIPELINE DISTRIBUTION AND OTHER WORK
- ENGINEERING AND DOCUMENT WORK
- FLOW METER AND ACCESSORIES METERING STATION
- FLOW COMPUTER AND CONTROL SYSTEM
- MANUAL VALVE AND ACCESSORIES
TECHTRONIC SCOPE OF WORK
| BASIC DESIGN | DETAIL ENGINEERING |
| PROJECT MANAGEMENT | PROCUREMENT |
| FABRICATION AND INSTALLATION | COMMISSIONING AND STARTUP |
CONDITION DATA : MULTI PRODUCT GASOLINE 91/95
| FLOW (TON/HR) | 1250 |
| PRESSURE (Kg/Cm2) | 24.8/47.6 |
| TEMPERATURE (°C) | 25/80 |
| PIPE SIZE (INCH) | 16 |
| METER TYPE | TURBINE METER |