PROJECT APPLICATION AND REFFERENCES

NEW PROPYLENEPIPELINE TO HMC PP#4PROJECT​

PROJECT DATA

LOCATION​NEW PROPYLENEPIPELINE TO HMC PP#4PROJECT​
OWNERPTT GLOBAL CHEMICALPUBLIC COMPANYLIMITED​
MAINCONTRACTOR​GC MAINTENANCE ANDENGINEERING CO., LTD​
YEAR OFCOMPLETION​YEAR 2021
CONTRACTVALUE​

PROJECT DESCRIPTION​

PIPELINE DISTRIBUTION AND OTHER WORK​

  • ENGINEERING AND DOCUMENT WORK​
  • FLOW METER AND ACCESSOIES METERINGSTATION​
  • FLOW COMPUTER AND CONTROL SYSTEM​
  • CALIBRATION AND METER PROVERCERTIFY​

BY EXCISE DEPARTMENT

TECHTRONIC SCOPE OF WORK 

BASIC DESIGN​DETAIL ENGINEERING
PROJECT MANAGEMENT​PROCUREMENT​
FABRICATION AND INSTALLATION​COMMISSIONING AND STARTUP​

CONDITION DATA : BIODIESEL 

FLOW (TON/HR)38.05/57.05
PRESSURE (Kg/Cm2)21.46/27.99​
TEMPERATURE (°C)43/65​
PIPE SIZE (INCH)3
METER TYPECORIOLIS MASS FLOWMETER